Survey and Retrofitting
At Gradient Power Ltd. we come across many interesting projects requiring bespoke design and implementation. The Generator Control Panels upgrade at Boots Plc. in Nottingham was one such project. Our engineers conducted a site survey, recommissioned the control panels with modern upgrades of the excitation and protection systems, completed a new connection agreement with the Distribution Network Operator and carried out power quality measurements to calculate an optimal operating power factor for the generators.